Projects
Work on the record.
A selection of recent installations and investigations across all four sectors. Each one lists the scope, so you can see how the job was actually put together.
Agricultural
Grain store supply & controls
Aberdeenshire · 2024
Three-phase supply, drying controls and standby resilience for a working grain store — designed around a harvest window that does not move.
Read case studyIndustrial
Process line re-control
Aberdeenshire · 2025
Legacy relay logic replaced with a PLC and HMI package, re-commissioned in phases so production could keep running between changeovers.
Read case studyCommercial
LV distribution upgrade
Aberdeen city centre · 2025
A dated distribution system replaced with a fully documented LV installation sized for the building's next decade — delivered over staged weekend shutdowns with the floor open every Monday.
Read case study